Environmental Constraints for the 1.29-mile FW-HASLET-TRA Sewer Project

For the City of Haslet: Tarrant County, Texas

Overview of alignment and backhoe trench location within Haslet Community Park, facing southwest

Overview of alignment and backhoe trench location within Haslet Community Park, facing southwest

In 2018, aci env consulting provided environmental services for the new 1.29-mile FW-HASLET-TRA Sewer Project in the City of Haslet, Tarrant County, TX.

The new gravity sewer interceptor was a join effort between the City of Haslet, the City of Fort Worth, and the Trinity River Authority of Texas. A jurisdictional waters of the U.S. assessment was completed identifying two potentially jurisdictional tributaries and one wetland feature. An endangered species review found no effect to federally-listed threatened and endangered species within Tarrant County, Texas was anticipated as a result of the project.

aci environmental consulting conducted a cultural resources survey including a pedestrian survey of the entire alignment with judgmental shovel testing and the excavation of 10 backhoe trenches along the unnamed tributaries to Henrietta Creek. The trench walls were profiled in detail and examined for the presence of cultural material. No cultural material was located during exploratory trenching. aci successfully completed an environmental constraints review of the proposed project on time and within budget.

Previous
Previous

Mustang SUD Wastewater Treatment Plant

Next
Next

Acequia Park Remediation